Title: Trail work at Turtle River - Sunday, September 18th
Post by: Sal Atticum on September 12, 2011, 09:30:55 AM
This is a general shoutout to anyone interested in doing trail work at TRSP this weekend.  This will be the first of two to three days (not in a row) of work that needs to be done to finish the loop for END-TOMBED (http://www.endracing.com/p/end-tombed-12-hr-mt-bike.html) (coming up October 29th).

If you are attending please email [email protected] and say who you are and what you're bringing so we can get an accurate count.

Details:
- Sunday, September 18th
- 1:30-4:30 PM at Turtle River State Park

Directions to site:
- Enter TRSP, stop at ranger station to get $5 vehicle pass if you don't have one (free entry pending, we're asking)
- Take first right after ranger station.
- Continue north until you pass second bridge; park in lot to the right.

What to bring (if you have it):
- Long pants/long-sleeved shirt (stinging nettles and bugs are possible)
- Closed-toe shoes
- Shovels
- Rakes (leaf and rock)
- Weedwhackers or machetes for soft stuff
- Handsaws for woody debris.  There may be one tree still in place, so a chainsaw or cordless power saw might be useful.
- Other implements of construction if you think they will be useful. 
- Your mountain bike!

We will be more clearing brush than benching trail, so please don't bring a bulldozer or anything like that.  This is (for the moment) a temporary trail to be used for the END-TOMBED, however we plan to construct it to be as sustainable as possible in hopes that it can become a permanent part of the park.

We're looking into getting some pizza delivered for volunteers at some point as well.

One or two other trail days will include constructing a temporary bridge (for the race) across the Turtle River (at the end of the new trail) and clearing out brush on the other side of the river.